The assembly of C, L & U studs along with the nailing of fireblocks to studs.
Stud height | 12ft |
Nailing Cycle Time Firing Sequence | Every 2 seconds |
Air Supply Required | 1.52 CF/fire |
Timber Widths | 8in x 2in (max) |
Throat Opening | 7.87in |
Maximum block length | 14.5in |
Max Panel Length | See Wall/Stud Height |
Power requirements | 10amp, 110V, 1 phase |
Stud height | 3600mm |
Air Supply Required | 6-8 Bar |
Timber max. | 190x45mm |
Throat opening | 200mm |
Clamping area | 464mm to 64mm |
Maximum block length | 368mm |
Fire on the move | Yes |
Power requirements | 10amp, 110V, 1 phase |
Innovation specialists